top of page
Search

Mayde Creek High School Gets Total Makeover


KATY MAGAZINE

August 2, 2018

By Jennifer Skelton & Ashley Lancaster

The largest and most comprehensive renovation project in the school's history is expected to be complete before August 15.

(Gymnasium)

A NEW HOME FOR THE RAMS

The Mayde Creek Rams will start the first day of their 2018-2019 school year in an almost unrecognizable campus. The renovations were approved in the 2014 school bond, and have a price tag of just over $51 million. According to Mayde Creek High School Principal Ronnie Edwards, they could not have come at a better time.

"Katy ISD has done an excellent job at strategically planning when a campus is in need of updates or renovations, and we were able to see the benefit of that this year," he says. After taking a certain degree of water damage during Hurricane Harvey in August of last year, the completed changes will give fresh heart to the student body and staff.

A COMPLETE "MAYDE-OVER"

The new and improved learning areas and open spaces are literally designed to foster a positive school culture. "The design of the open spaces and flex seating in the common areas will facilitate more collaboration, and give students more opportunities to have their voices heard," he says.

The hallways and campus infrastructure have been streamlined as well, with Mayde Creek's back hallways being updated to connect and help students get to class faster. Additionally, a skybridge connecting the freshman center to the main campus will cut down on walking time.

The school will also integrate updated safety and security measures that are being implemented at campuses across the district. And while the ninth grade campus was not included in upgrades approved by the 2014 bond, Mayde Creek freshman will benefit from new classroom furniture, flooring, and updated paint.

A new "Genius Bar" in the school library will also be available, giving students increased opportunities for the use of technology.

(Genius Bar in the school library)

Overall, Mr. Edwards and the rest of the Mayde Creek staff are proud of the success of the project. "We have kept track and taken photos of the renovations from start to finish. It's important for the community to get a good picture of just how much has changed and how it will benefit future Rams."

DETAILS OF MAYDE CREEK'S MAKEOVER

  • Classroom Renovations to meet current program needs in original section of high school – including Science, Fine Arts, CTE, Administration, Library, Kitchen/Commons

  • Modify access to building – review construction of corridors to connect halls

  • Mechanical, Electrical & Plumbing upgrades/replacement

  • Elevator replacement

  • Replacement of finishes – flooring, ceiling, carpet

  • Renovations to Softball field to meet Title IX

  • Installation of Walk In Floral Cooler

  • Relocate Lights above Pool

  • Reconstruct access road around Mayde Creek complex

2017 BOND

Every school bond generally has normal upgrades and maintenance for all school campuses Additional items were approved for Mayde Creek High School on the 2017 bond.

  • Roofing

  • Athletic Turf Replacement

  • Scoreboard Replacement in Gyms

  • Technology Retrofit and Tablets

  • Document Cameras

  • Printer Replacements

PREVIOUS UPDATES

  • Upgrade Electrical System (1999)

  • Renovations & Additions: Library, Athletics, Administration & Music (1999)

  • 9th Grade Center & Performing Arts Center (PAC) (2002)

  • Exterior Door Replacement (2007)

  • Natatorium (2008)

  • Central Plant (2012)

  • Security Vestibule (2012)

(New flexible seating upstairs)

4 Comments


ENTE SECX
ENTE SECX
2 days ago
Like

CQTS NWVB
CQTS NWVB
Dec 10

google seo google seo技术+飞机TG+cheng716051;

game game

Fortune Tiger Fortune Tiger;

456bet 456bet

Fortune Tiger Fortune Tiger;

Fortune Tiger Fortune Tiger;

Fortune Tiger Slots Fortune Tiger…

03topgame 03topgame

EPS машины EPS машины;

seo seo;

EPS Machine EPS and EPP…

EPS Machine EPS and EPP…

EPS Machine EPS Cutting Machine;

Like

CQTS NWVB
CQTS NWVB
Dec 01

google seo google seo技术+飞机TG+cheng716051;

game game

game game

Fortune Tiger Fortune Tiger;

game game

Fortune Tiger Fortune Tiger;

Fortune Tiger Fortune Tiger;

Fortune Tiger Slots Fortune Tiger…

03topgame 03topgame

EPS машины EPS машины;

EPS Machine EPS Cutting Machine;

EPS Machine EPS and EPP…

EPS Machine EPS and EPP…

EPS Machine EPS Cutting Machine;

Like

NKJD IITY
NKJD IITY
Nov 18

谷歌seo优化 谷歌SEO优化;

Fortune Tiger Fortune Tiger;

Fortune Tiger Fortune Tiger;

Fortune Tiger Slots Fortune…

Fortune Tiger Fortune Tiger;

Fortune Tiger Fortune Tiger;

Fortune Tiger Slots Fortune…

EPS машины EPS машины;

ETPU машины ETPU машины;

EPP машины EPP машины;

Like
bottom of page